Skip to main content
LeadSafe Hudson LeadSafe HudsonNJ lead-safe certification guide
Last updated: August 27, 2026

How much does a lead inspection cost in Hudson County?

Verified August 27, 2026

A lead-safe visual inspection in Hudson County, New Jersey runs $125–200 per unit at market rates, plus a $20 state certificate fee and, in some towns but not all, a municipal fee on top: $200 per unit in Jersey City (city fee schedule § 160-1), $125 to $200 by bedroom count in Hoboken, $250 plus a $25 filing fee in Bayonne. Five of the twelve Hudson County municipalities publish no local lead fee at all, and Union City folds the $20 into its own charge instead of adding it, so check your municipality before you budget. Where a local fee exists it is cost recovery by rule: a town may charge only what its inspection program costs and cannot spend it on anything else (N.J.A.C. 5:28A-2.2), which is why the number changes from town to town. The $20 certificate fee is set by the state, so it is identical everywhere in New Jersey; everything above it is local and that is where the spread comes from. Multi-unit buildings and portfolios get per-unit discounts. For comparison, a missed deadline costs up to $1,000 per week in fines.

Pricing by portfolio size

UnitsTypical range per unitNotes
1 unit$150–200Single visit, certificate filed for you
2–4 units$145–180Same building, same visit
5–20 units$140–165Scheduled block, one invoice
20+ units (bulk)$125–150Portfolio pricing, 48-hour SLA, COI on request

Checked September 2026 against published price lists in the county: contractors advertising rates for Hudson County visual inspections run $145 to $180 per unit, and the low end sits at $125 where the contractor includes the lab fee. Dust-wipe sampling and XRF surveys are separate, more expensive services and are not in this table.

Ranges reflect the NJ market before a partner price sheet is in place; final quotes come from the licensed contractor by phone. No number on this page is a binding offer.

☎ Get a quote: (551) 373-3311 Two minutes: address, unit count, timing.

What the price includes

Visual inspection of all painted surfaces: friction and impact points, windows, trim, doors, per HUD guidelines
Inspection by a NJ DOH-certified inspector (N.J.A.C. 8:62) with a DCA-licensed contractor
The lead-safe certificate itself, valid 2 years
Filing with your municipality (local fee billed at cost)

Not included: the $20 state fee, any municipal fee your town charges, dust-wipe lab work if the inspector finds a reason to add it, and any remediation if the unit fails. Local fees by municipality →

The municipal route is often cheaper

Seven Hudson County towns run their own inspection program and publish what it costs. In most of them the municipal visit undercuts the private market rate, because by rule a town may only recover what the program costs it. The trade-off is scheduling: you take the town's queue instead of a private contractor's next opening.

MunicipalityMunicipal fee per unitSet by
Guttenberg$50 + $20 state§ 13-13
Kearny$120 + $20 filing§ 15-5.9
Union City$120 up to 4 units, $220 above; state fee included§ 273-8
Hoboken$125 to $200 by bedroom count + $20 state§ 125-15
Jersey City$200 non-refundable + $20 state§ 160-1
Bayonne$250 + $25 city filing + $20 state§ 17-33.2g
Harrison$250 + $25 filing + $20 stateOrd. 1514

Two towns reward bringing your own inspector: in Hoboken (§ 125-15E) and Kearny (§ 15-5.9) the municipal inspection fee does not apply when you hire a DCA-certified contractor yourself, leaving only the $20 state fee. The other five municipalities publish no inspection fee of their own. That does not always mean there is none: North Bergen runs its program through a contractor without posting a rate, so ask before you assume. In Secaucus the reason is different again: the town repealed its lead chapter in May 2026, leaving the $20 state fee as the only fixed charge.

Inspection vs. doing nothing

$150–200

One inspection for a typical single unit. Done in under an hour, certificate good for 2 years.

Up to $1,000/week

Fines after the 30-day cure period expires, accruing weekly until the unit is certified. Penalty details

Cost questions

Does every unit in my building need its own inspection?

Yes, certificates are issued per unit. Same-visit pricing brings the per-unit cost down; see the table above.

Is a dust-wipe inspection more expensive?

Usually, because samples go to a lab. In Hudson County the required method is visual; dust wipes come in only at the inspector's discretion or after a failed visual.

What if the unit fails?

You fix the hazard (often targeted paint stabilization, not full abatement) and re-inspect. Remediation costs vary too widely to quote here; get the specifics on the phone.

Get an exact number for your building

Address, unit count, last certificate date. Quote on the call, inspection within 48 hours.

☎ Call (551) 373-3311
☎ Call (551) 373-3311 · 8am–7pm